Project Description
The contract was phased into two residential blocks, comprising the 2mm aluminium Eltherington Architectural Secret Fix Cladding System. The architectural grade polyester powder coated cladding was attached to Eltherington internal rail solution.
These residential blocks formed part of a local redevelopment of the borough of Hackney. The project is a two minute walk from the newly opened Haggerston DLR station. MCS were commissioned to supply the powder coating to all the external cladding used on both blocks.
‘We all appreciate that specification can be key to winning projects, architects, consultants & clients require choice and variation. Metal Coating Systems Ltd was approached by Eltherington Architectural and subsequently supplied several colour samples over a period of 3 months. Numerous meetings and lots of communications later colours were eventually chosen and Eltherington were happy for Metal Coating Systems Ltd to be the polyester powder coated supplier for (Haggerston /HKR..etc). We have worked with MCS for over 20 years and appreciate their excellent service.’
Mike Riding, Director, Eltherington Group.